BETONITE TREATMENT PLANT

Treatment units, designed by Ptech GmbH Sistemleri for bentonite intensive wastewater occured during excavation works at construction sites, are designed in compact forms with varying capacities to meet the specific needs. The problem of bentonite intensive wastewater which poses a significant challenge for construction companies, is completely eradicated by the package treatment units we offer.

Bentonite treatment units are entirely prefabricated and a manufacturing time of 8-10 weeks on average. The installation and commissioning for operation after manufacturing takes 1 week. After the operation training provided to a personnel designated by the employer company, the facility is handed over to the end user.